Glossary

Rated IT Load (data-centre capacity threshold)

The Cyber Security and Resilience Bill uses a 1 MW rated IT load threshold (10 MW for enterprise-only centres) to determine whether a data centre is in scope.

Appears inAI and Data Infrastructure